What Happens at a Garage Door Survey?

At a glance

  • A free survey takes under an hour: we measure the opening, headroom and side room and check the power supply.
  • The quote that follows is fixed and covers supply, fitting, motor, controls, trims and removal of the old door.
  • A roller door needs about 75mm of side room each side and a box of 205mm to 300mm above the opening.
  • Fully fitted doors start from £1,275 inc VAT; remote control packages with a safety edge from £1,475 inc VAT.
  • Book the survey first: the quote and the made-to-measure order follow it, so the earlier it is booked the better.
Book a Free Survey

Nearly every roller garage door we fit starts the same way: a free survey on the driveway, a cup of tea if one is going, and a written quote a short while later. The survey is where the guesswork ends. A roller door is made to measure for your opening, so the numbers taken on that visit decide how the door fits, how it runs and what it costs. This guide walks through the visit from start to finish so you know what to expect before you book.

Why We Survey Before We Quote

A roller garage door is not an off-the-shelf product. The curtain sits inside two guide runners and rolls into a box above the opening, so the finished assembly is slightly wider and taller than the hole in the wall. Get the measurements wrong by a few centimetres and the door either will not fit or leaves gaps that let in draughts and rain. Measuring on site, by someone who fits these doors every week, is the only way to be sure.

It also means the quote you receive is the price you pay. Because we have seen the opening, the power supply and the old door, there is nothing left to discover on installation day and nothing to add to the bill afterwards.

Step One: Measuring the Opening

The first job is the structural opening itself. We measure the width and the height at more than one point, because older openings are rarely perfectly square, and we work from the tightest figures. We note the condition of the reveal and the lintel, and whether the brickwork or timber frame around the opening needs anything before the new door goes in.

If you would like a head start on those numbers before we arrive, our guide to measuring your garage opening explains how to do it with a tape measure. It is not required. We take our own measurements on every survey, whatever you have sent us.

White electric roller garage door fitted inside a single brick garage opening
Every door is made to the measurements taken at the survey, which is why the fit is exact.

Step Two: Headroom and Side Room

Next we look above and beside the opening. A roller door needs approximately 75mm of clear space on each side of the opening for the guide runners, and enough headroom above it for the top box, which is typically between 205mm and 300mm depending on the door size. Because the curtain rolls up into that box rather than sliding back along the ceiling, a roller door needs very little depth inside the garage. That is why they suit garages with low ceilings, storage racks or a room above.

Where the headroom is tight, the survey settles how the door will be mounted. A reveal fit sits inside the structural opening, with the runners and the box tucked behind the brickwork. A face fit mounts on the wall around the opening, which keeps the full drive-through width when the reveal is narrow or uneven. We decide this on the day and explain why.

Step Three: The Old Door and the Power

If there is an existing door, we check how it is fixed and what will be involved in taking it out. Removal and disposal of the old door, including tracks, springs and fittings, is part of every RollRite installation and is included in the price. Replacing an old up and over door with a roller door usually needs no building work at all.

An electric roller door needs a power supply, so we look for the nearest socket or spur and confirm it is suitable. Most garages already have what is needed. If yours does not, we tell you at the survey rather than on installation day. Our guide to the electrical supply an electric roller door needs explains what we are looking for.

Step Four: Colours, Slats and Controls

With the measurements done, the conversation turns to the door itself. There are three choices to make, and the survey is the easiest place to make them because you can hold the samples against your own brickwork:

Dark blue electric roller garage door with a white top box and guide runners on a brick house
Colour samples held against your own brickwork settle the choice faster than any website.

What the Written Quote Includes

After the visit you receive a written fixed-price quote. It covers supply, installation, the electric motor, the controls, the safety edge, the manual override and all trims, plus removal and disposal of the old door. All RollRite prices include full installation and VAT, so there are no hidden fitting charges. Fully fitted doors start from £1,275 inc VAT for a 55mm insulated door with key switch operation, and remote control packages with a safety edge start from £1,475 inc VAT. Our roller garage door cost and packages page sets out each package, and if you already know your opening size you can work out your fitted price before we visit.

There is no pressure to decide on the day. The quote is yours to consider in your own time, and the price on it is the price you pay.

Ready to find out what your garage needs? The survey is free, takes under an hour and carries no obligation.

Book a Free Survey

What to Have Ready

Very little. The opening needs to be reachable, so a car parked hard against the door is the only real obstacle. It helps to have thought about colour, and to know whether you want a remote control or a key switch, but both can be decided afterwards. If you have photographs of the garage or a sketch with rough measurements, send them when you book and we will arrive knowing roughly what to expect.

From Survey to Installation Day

Once you accept the quote, the door is made to your measurements. On installation day most single roller doors are fitted in one visit: the old door comes out, the guide runners and the box go in, the motor and controls are fitted and programmed, and the door is tested before we hand over the remotes. Our guide to how long a roller door installation takes covers what happens on the day.

The survey comes first, because the quote and the made-to-measure order follow it, so the earlier it is booked the better.

Booking a Survey with RollRite

We are based in Sible Hedingham, near Halstead, and cover all of Essex plus parts of Suffolk, Hertfordshire and the east London border. Colchester, Braintree, Chelmsford and Sudbury are all a short drive from the workshop. To book, call 01376 800 750 or use the survey form, and we will find a time that suits you.

Key Takeaways

Conclusion

A survey is not a sales visit. It is the measuring, checking and talking through that lets a made-to-measure door fit first time and a quote hold its price. Book it early, have the opening reachable, and the rest is ours to do.

Frequently Asked Questions

Is the garage door survey really free?

Yes. There is no charge for the survey or for the quote, and there is no obligation. One of our team measures the opening, headroom and side room, checks the power supply and leaves you a clear written quote covering supply, fitting and aftercare.

How long does a garage door survey take?

Most surveys are over within the hour. Measuring the opening, checking the headroom, side room and power supply, and talking through colours and operation does not take long, and the written quote follows afterwards so you can consider it in your own time.

Do I need to clear the garage before the survey?

No. We need to reach the opening, the lintel above it and the walls either side, and to see where the power is. If the car is on the drive and the opening is clear, that is enough. Clearing the garage comes later, before installation day.

Will a roller door fit if my garage has a low ceiling?

Usually, yes. The curtain rolls into a compact box above the opening rather than sliding along ceiling tracks, so roller doors need very little internal depth. The survey confirms there is approximately 75mm of clear space each side for the guide runners and between 205mm and 300mm of headroom for the top box.

Do you take the old up and over door away?

Yes. RollRite remove and dispose of the existing garage door as part of the installation, including the tracks, springs and fittings, and the cost of removal is included in the installation price.

What does the written quote include?

The quote covers supply, installation, the electric motor, the controls, the safety edge, the manual override and all trims, plus removal and disposal of the old door. Every RollRite price includes full installation and VAT, so there are no hidden fitting charges. Fully fitted doors start from £1,275 inc VAT.

More Garage Doors Blog Posts

Why not book a Free Survey?

One of our team measures the opening, checks the headroom and power, talks through colours and controls, and leaves you a fixed written quote. No charge, no obligation.

Book a Free Survey