Skip to content
Unit 6 Cherrytree Farm, Sible Hedingham CO9 3LZ 01376 800 750

Advice 8 January 2027 By RollRite

A New Garage Door for the New Year

At a glance

  • If the old door failed over Christmas, January is the month most people finally replace it. Here is the whole journey, step by step.
  • Ten minutes with a tape measure and two minutes on the cost calculator give you a fitted price before anyone visits.
  • The free survey takes under an hour and ends with a fixed written quote; the door is made to measure once you accept it.
  • Most single garage doors are fitted in one visit, the old door is removed as part of the job, and the month makes no difference to the work.
  • We promise only the dates the website states, so the quickest route to a new door this year is booking the survey now.
Book a Free Survey

There is a reason the phone is busiest in the first two weeks of January. A door that was merely annoying in October has had three months of cold, wet and dark to show what it really is, the family has been in and out of the garage all holiday, and the new year brings the resolve to sort it. The journey from there to a new door is shorter and simpler than most people expect, and nothing in it depends on the month.

If the Old Door Has Already Failed

First things first. If the door is stuck, frozen to the floor or sitting out of its guides, do not force it: a manual roller door with a broken spring and an up and over with a snapped cable are both heavier than they look. Clear the threshold, let any ice thaw, and secure the garage with the side door and the door into the house. Our guides to roller doors in cold weather and emergency roller door repairs cover the next hour. Then start the steps below, because a door that has failed once in January will fail again in February.

Step One: Measure the Opening (Ten Minutes)

You do not have to, because we measure on every survey, but a rough measurement tells you which door you are looking at and what it costs before anyone visits. Stand inside the garage with the door open and measure the width and height of the brick opening at three points each, keeping the smallest figures. Then measure the clear space above the opening, which is the headroom for the box, and the clear wall each side for the guide runners. Our guides to measuring a garage door opening and how much headroom a roller door needs give the numbers to look for.

Step Two: Price It Online (Two Minutes)

Put the width into the cost calculator, pick the package, the colour and any extras, and it gives you a fully fitted price inc VAT. As a guide before you start: a RollRite roller door costs from £1,275 inc VAT fully fitted with key switch operation, remote control packages with a safety edge start from £1,475 inc VAT, and the 77mm profile for wider and double openings starts from £1,790 inc VAT. Our guide to what a replacement garage door costs explains what moves the figure and why taking the old door out does not add to it.

Grey electric roller garage door fitted to a single brick garage
Width, package and colour set the price; the calculator gives it in two minutes, the survey fixes it.

Step Three: The Free Survey (Under an Hour)

Book it online or by phone and one of us comes to the garage. We measure the opening properly, check the headroom and side room, find the power and confirm it is suitable, look at how the old door is fixed, and hold colour samples against your brickwork. There is no charge and no obligation. Our guide to what happens at a garage door survey walks through the visit. In January the only extra is a clear path to the garage if the drive has iced.

Choosing the Package in Winter Light

Three choices are made at the survey, and January is a good month to make them. The operating package: a key switch, or a remote control with a safety edge, which is the one most people choose once they have stood in the rain fumbling for a key. The slat profile: 55mm for a single garage up to 2.7 metres, 77mm for anything wider, chosen by the opening rather than by you. And the colour, held against the brickwork in the flat grey light that shows a colour as it really is for most of the year. White is standard; any other colour adds £100 inc VAT. Every slat is foam-filled, so the insulation comes with the door rather than as an upgrade.

Step Four: The Fixed Written Quote

After the survey you receive a written quote that covers supply, installation, the motor and controls, the safety edge on remote packages, the manual override, all trims, and removal and disposal of the old door, with VAT included. The price on it is the price you pay. It is yours to consider in your own time; nobody rings to chase it.

Step Five: Made to Measure

Once you accept the quote, the door is made to the measurements from the survey: the curtain, the box, the guide runners and the colour you chose. This is the part of the journey that takes time, and it is the part we will not put a date on here, because we only promise the dates the website states. What we can say is that the survey is the gate: nothing is ordered until it has happened, so the earlier it is booked, the earlier the rest follows.

Step Six: Fitting Day

Most single garage doors are fitted in one visit. The old door comes out first, with its tracks, springs and fittings; the guide runners and the box go in; the motor and controls are fitted and programmed; the door is tested, the safety edge is checked, and the remotes are handed over with a walk-through of the manual override. The garage is open to the weather for part of the day, so anything that should not get cold or wet is worth moving the night before. Our guides to how long a roller door installation takes and preparing the garage for the fitters cover the day in detail.

Electric roller garage door installation finished by RollRite
One visit for most single garages: old door out, new door in, tested and handed over.

What Changes Once It Is In

The things January made obvious stop being problems. Nothing swings out across an icy drive, because the curtain rolls straight up into its box. The door locks itself with anti-lift locking when it is fully closed, so the garage is no longer the weak point of the house on a dark evening. The foam-filled slats keep the garage warmer than a single-skin door did. And if a storm takes the power out, the manual override gets the car out. The rest of the winter is covered, and so is the next one.

Where We Work

We are based in Sible Hedingham near Halstead and survey across Essex plus parts of Suffolk, Hertfordshire and the east London border: the CM, CO, SS, RM, IG, CB, SG, IP and EN postcode areas. Steve and Matt do every survey and every fit themselves.

Decided over Christmas? Book the free survey now and the rest of the journey follows from it.

Book a Free Survey

Key Takeaways

Conclusion

A new garage door in January is six short steps, and only one of them, the survey, needs you to be in. Measure if you are curious, run the calculator, and book the visit. The door that gave up over Christmas does not have to see another winter.

Frequently Asked Questions

Is January a bad time of year to replace a garage door?

No. A roller door is fitted to the garage opening in a single visit on most single garages, and nothing about the job depends on the season. The things that do change in winter are on your side: a door that no longer closes, a drive that ices, and dark evenings that make the garage the weak point of the house. Replacing it in January means the rest of the winter is covered.

How long does it take to get a new garage door fitted from first enquiry?

The steps are quick: measuring takes ten minutes, the calculator gives a guide price in two, the survey takes under an hour, and the fitting itself is usually one visit. Between the survey and the fitting the door is made to your measurements. We only promise the dates the website states, so the honest answer is that an early survey is the shortest route.

Can I get a price for a new garage door without a salesman visiting?

Yes. The RollRite cost calculator gives a fully fitted price inc VAT from the width of your opening, the package and the colour, in a couple of minutes. The survey confirms it as a fixed written quote once we have seen the opening, the headroom, the side room and the power. There is no pressure at either stage.

What happens to my old garage door when the new one is fitted?

It comes out on the fitting day and goes away with us. Removal of the old door, its tracks, springs and fittings is part of every RollRite installation. A metal door is disposed of free of charge; a small fee applies for non-metal doors such as timber, and the survey tells you if that applies.

Does fitting a new garage door in winter need any building work?

Rarely in any season. A roller door fits to the structural opening, either inside the reveal or on the wall around it, so the brickwork is not touched. The survey checks the opening, the headroom above it for the box and the side room for the runners, and tells you on the day if your garage is one of the few that needs more.

What should I have ready before a garage door survey in winter?

Very little. The opening needs to be reachable, so a car parked hard against the door is the only real obstacle. If the drive is icy, a path to the garage helps. Think about colour and whether you want a remote or a key switch, but both can be decided afterwards, and samples are held against your brickwork on the day.

More Garage Doors Blog Posts

Why not book a Free Survey?

One of our team measures the opening, checks the headroom and power, talks through colours and controls, and leaves you a fixed written quote. No charge, no obligation.

Book a Free Survey

Excellent

Based on 14 reviews

Google

Showing the 12 most recent Google reviews as of our last update, newest first. No filtering by rating. Read all 14 on Google.